Scheduled
Engineers will be replacing public network top of rack switching in cabinet S02.D01.04 in the PHX-1 data center. This hardware has been identified as running in a degraded state and is proactively being replaced to avoid any unexpected downtime. Client servers in these cabinets will lose network-level redundancy on the public network during this maintenance. Private and storage networking will not be affected.
Posted 27 days ago. Aug 28, 2018 - 17:27 CDT